Tag Archives: connective corridor

The Northside

Some around town might say the northside is the wrong side with rising crime and increasing poverty. I suppose we can pinpoint the fall to when the Wegmans on Pond Street closed. If you are not from the area the … Continue reading

Posted in Lost and Found | Tagged , , | Leave a comment

Last Call

There was a bar here once. It went by the name of Shenanigans. At some point in the past five years or so it closed. Sitting a busy part of the city more than a few more entrepreneurs tried to make a … Continue reading

Posted in On the Job | Tagged , , | Leave a comment

Volvo For a Good Time

You have waited long enough. But for what? A video of construction work promised back to you on April 3rd of last year. Back during that time I was spoiled when it came to the connective corridor construction work taking … Continue reading

Posted in Heavy Equipment | Tagged , , , | Leave a comment

The Birth of a Street

Drivers rejoice! A new street is entering the world or at the very least, half a street. Now that utilities, curbs, and sidewalks have all been upgraded or replaced work has started on rebuilding the tattered remains of West Fayette … Continue reading

Posted in On the Job | Tagged , , | Leave a comment

Oshkosh Drill Rig Truck

Some trucks have it. Others don’t. This truck my friends, an Oshkosh P-Series, has it in spades. I spotted this beast the other day on the Connective Corridor project. A crew of workers from M.L. Caccamise were getting ready to … Continue reading

Posted in On the Job | Tagged , , | Leave a comment

Connective Corridor

There’s a doings transpiring! Look at this beautiful mess, it’s the start of the Connective Corridor, a plan that will link downtown Syracuse with Syracuse University through the use of bike lanes, sidewalks, lighting, and benches. For drivers entering the … Continue reading

Posted in On the Job | Tagged | Leave a comment